Step 4

Final Details Inside & Out

After your radon mitigation system has been glued in and cleaned up, it’s time to give the components located outside an equally professional finish.

A urethane caulk is used to seal around the pipe leading into the house from the outside. The final connection for the Fan Guard moisture control unit is installed which directs any moisture away from the fan and into the draintile system.

Then the fan is tested and the housing cover is installed.

Meanwhile, a vacuum monitor is installed inside. The vacuum monitor will be used as a visual check to ensure the fan is working.